HOMEBASE

Friday, 30 June 2023

Artist's Access to Winn's Gallery - please sign the petition



The arts community in Waltham Forest have very little community provision for art exhibitions and events, this is despite Waltham Forest having been promoted as a hub of creativity, and being the first ever London Borough of Culture. The one space, Winns Gallery in Lloyd Park, originally created from Lottery funding for this purpose, has been almost impossible to access for local artists in the last few years. Artists trying to hire the space have met with emails unanswered, reports about confusing information re pricing, and links not working.  

If this situation continues it will further impede local artists from facilitating public engagement in the artistic life of the community. There are exciting arts projects going on in the borough that could be using the space and showing some of the best emerging, and well established artists from within - and also beyond the borough - which would contribute greatly to Waltham Forest’s reputation as a ’destination’. It is a huge missed opportunity for all.

Now is the time to act! If this situation continues, local artists fear that the space will be lost to them completely, due to confusing management which in turn could lead to an incorrect assumption by the local council that Winns Gallery is not in use and is therefore no longer needed by artists living in the borough.

Please sign the Petition

Save the Margaret Centre

 

Save the Margaret Centre
Click here to sign our petition
  • The Margaret Centre is a specialist inpatient unit which provides end of life and palliative care. While similar to a hospice it is run by the NHS and is part of Whipps Cross Hospital. It's widely praised by those whose loved ones have spent their last days there.
  • But when the new hospital is built, the Margaret Centre will be demolished, and the land sold for housing.
  • The North East London Integrated Care Board (ICB) is a new health organisation which is responsible for commissioning end of life and palliative care services. It is doing a review of options for end of life care in the Whipps Cross catchment area. The options will be put to us - the public - in a public consultation in the Autumn 2023
 
Action4Whipps is campaigning for the ICB to include in the options the re-provision of the Margaret Centre on the new Whipps Cross Hospital site. But there's a real risk it won't be one of the options.
If that happens, we'll lose the Margaret Centre.
So please sign & share widely
Click here to sign our petition
 
Many thanks
Eva Turner
on behalf of A4W
Copyright © 2023 Waltham Forest Save Our NHS, All rights reserved.

Thursday, 29 June 2023

Lea Bridge Station Sites Redevelopment - Update

 



Pocket Park






Dear Councillors


Re: the Update on Lea Bridge Station Sites

  1. Additional staircases should have been designed in from the beginning
The proposed raising of the heights of the towers at Lea Bridge Station Sites is cited as being prompted by the inclusion of additional staircases. I note however that the Lea Bridge Station Sites scheme has long been planned by the Council, in association with an appointed developer, and has had the time and opportunity to design additional staircases without waiting for new Building Regs to come into force. At the Cabinet meeting or 20th June 1917, which was two months after the Grenfell high-rise tower tragedy, I spoke raising concerns about the long-term implications of planning and fire safety in the construction of Motion (97 Lea Bridge Road) and other proposals in the Lea Bridge and Leyton Vision (which included tall buildings at the station). I pressed for construction to be halted until detailed investigations were made. The then Leader, Cllr Clare Coghill being absent from the meeting, the Chair was taken by Cllr Jenny Gray who told me that I should only speak about the Lea Bridge and Leyton Master Plan and no other development projects. See the record from Cabinet Minutes 20/06/17 - six years ago - below. 
No credence was given to the points I made.






In the meantime, Motion was built with no additional staircases in any of the three towers, and now the LBSS towers have been planned without regard for what happened at Grenfell, in spite of the widespread national reporting and analysis as to why many residents could not escape the dreadful fire that consumed their homes.

  1. Raised height of the LBSS towers will impact on residents of Motion and on the life and utilisation of the Marshes
Many original objections to this development, including my own, included the grounds of the height of the buildings.  These objections came both from residents who will be affected – and that affect was both noted and overruled in the original application - and from groups and individuals further afield who made environmental objections. The Station Sites' unprecedentedly high blocks will define the views eastwards of people making use of the Marshes. Adding even one storey to that will amplify the adverse effect because of the interplay of visual perspectives. Crucially it will also impact on that open space's wildlife habitat, especially the routes of migratory birds. The image below illustrates the scale of the new buildings in relation to Motion and the nearby low-rise buildings. This will cause newly-significant impact on Motion residents' light, which the Council declined to inform prospective purchasers about in spite of existing local residents raising the issue formally with the then Cabinet member.


  1. Environmental issues
I draw to your attention some serious environmental issues. Energy conservation for the purposes of cooling and heating is made more difficult the higher a building rises to the sky. In the case of LBSS towers their isolation on the wide open space of the Marshes means their heat loss and susceptibility to cold wind and hot sun is exacerbated - the top two storeys being the most impacted. Again the image above illustrates this.

I ask whether both the EIA and the Financial Viability surveys will be thoroughly re-examined in the light of this.

  1. Aviation
Looking at the Trium LBSS EIA Scoping Report I note that the proposal to SCOPE OUT Aviation was approved on the grounds of LBSS not being within London City Airport Aerodrome Safeguarding area and the tallest building not exceeding +99.3m AOD. As objectors stated originally, this clause in the Scoping Reports omits any mention of helicopters. During the construction phase of the raised towers the 99.3m AOD is likely to be exceeded.  I note that Waltham Forest is one of the most flown-over boroughs because of its position under flight paths of three airports, and its proximity to helicopter ports including the roof of London Hospital in Mile End and the Police heliport in Essex. Residents experience frequent helicopter flights over this part of Lea Bridge due to the incidents of accidents and crime in the area and the opportunity for landing spots - for instance the very nearby Jubilee Park has been used by the Air Ambulance more than once and also the crossroads at the centre of the LBSS. In considering that on 16 January 2013, an Agusta A109 helicopter crashed in Vauxhall, south London, after it collided with the jib of a construction crane attached to St George Wharf Tower, when the pilot and a pedestrian were killed, I urge that the topic of Aviation needs to be SCOPED IN.

Conclusion

I believe it would be erroneous to consider the raising of heights of the LBSS towers as an incremental matter since it will incur critical changes to the original plans. I am therefore writing in advance of the planning application during the time that, as I understand it, the design of the additional staircases will be approved as non-material amendments. I appeal to Councillors to take full consideration of the critical points I have made when overseeing the proposed non-material changes.

Regards

Claire Weiss
Resident

Central Parade

 


Central Parade rear yard development






The yard behind Central Parade now sacrificed for another block of flats 
- at least they are social housing







Tuesday, 27 June 2023

Supplementary Planning Document - SPDs


Part of the Local Plan process are Suplementary Planning Documents (SPD) which will advise the Planners when considering a Planning Application. The current consultation is to establish what should be included and later in the year the documents will be prepared and sent out for further consultation.



Walthamstow Town Centre - Update

 

Work is progressing with building the 2 tower blocks 34 and 27 storeys. The core for the taller block is already at 6 storeys. Completion expected in 2025 - that's likely to be optimistic!  

Despite 72 people being killed in the Grenfell fire, Long Harbour has not seen fit to stop construction and redesign the tower blocks with 2 staircases as new legislation demands.

Mayor Demands 2 staircases

Work to start soon on digging a big hole down to the Victoria Line so the new station entrance can be created. The hole has to be completed by 2025.

Meanwhile let's see if we can get a bigger playground built now 

rather than wait years for the whole site to be completed. 

PLEASE SIGN THE PETITION




Core up to 6 storeys





C&R Maximising its revenues




New CRATE lesisure area









Skyline (formerly Poll Tax House!) - update

 Soon to be completed Skyline, formerly Juniper House and before that Poll Tax House


Skyline

LBWF


Squeezing a lot into a small space to maximise return for the council.


Note the over shadowing


Partly to be used by Portsmouth University


Impact on the Victorian Streets