Friday, 30 November 2018

Closure of the booking office at Wood Street Station



Wood Street Station Ticket Office Closure 

Good Afternoon Everyone:    I think you will support us in our concerns at TFLs decision to close the Wood Street Station Ticket Office.  After spending all that money on building a new Ticket Office they now want to close it.  Its totally unbelievable what they are doing.  If they knew they were going to close it why didn't they spend all that money on installing the much needed lifts at the Station. 

If like me you would like to have your say about the Ticket Office Closure you can do so in the following ways:

By Post:  London Travel Watch, 159 Union Street, London, SE1 0LL


Tuesday, 27 November 2018

Strettons to become an hotel

 



The Strettons office at the junction of Hoe Street and St.Mary's road is to become an 11 storey hotel and 5 storey office block. Not only is this an inappropriate site for such a development as it is almost inaccessible for construction traffic and it is totally out of scale with the surrounding 2 storey Victorian Terraces.
Please send in your objections to the Planning Department before the 8th December 2018.

Planning Dept: dmconsultations@walthamforest.gov.uk

Strettons wrote in 2017 saying it would be a Premier Inn and be 13 Storeys and this is the image I produced then to object to it.



After extensive consultation with the planning officers and limited consultation with the public they have reduced it by 2 storeys to 11.

It will now look like this but whether it will be a Premier Inn is not mentioned in the planning documents.

View from Selborne Road gyratory junction

View at the junction of St Mary's Road and Hoe Street

View down St Mary's Road

Below is the Civic Society's objection to this development:


Brett McAllister
Development Management
The Magistrates
1 Farnan Avenue
London E17 4NX



Dear Mr. McAllister,

Application No: 183632
189-203 Hoe Street, Walthamstow, London E17 3AP

It is unusual but this application has been well presented and public consultation has been better than normal but no real effort was made to engage the community hence only 23 responses.

1.     Construction Issues
a.     Neighbouring developments – In the WSP document Outline Construction Logistics Plan Paragraph 3.2.2 and 3.2.5 refer to neighbouring construction sites. It is prepared to “assist in the assessment of freight consolidation opportunities and cumulative impacts of construction operations in the area”. As a construction company has not been appointed this seems over optimistic!
b.     Other sites – If the C&R Town Centre development goes ahead, which is due to start in 2020, and go on for at least 5 years the Hoe Street area will be heavily congested with construction traffic. Juniper House is also up for development and this will create more construction traffic. Currently this part of the Town Centre has been a building site for at least 2 years waiting for the gyratory system to be completed and Walthamstow Gateway. No sooner will they be completed and Central House will start in March 2019 and go on until June 2020. Juniper House will start in 2019 and go on well into 2020. There are plans to rebuild Walthamstow Central which will also become a building site for many years. All this means residents of this area will have experienced building site conditions for 10 years or more. This is unacceptable and makes Central Walthamstow a very unattractive place.
c.     Central House has very limited access which means St Mary’s Road and Stainforth Road will have to bear all the construction traffic. Church Hill is limited to 7.5 tonnes so this will mean increasing the number of lorries to service the site. This area was held up by the council as a great Mini Holland success. The quieter roads created will now be the main routes for the construction traffic meaning the Mini Holland expenditure was a waste of public money.
d.     The corner of St Mary’s Road and Hoe Street is a major pedestrian route to the station so what restrictions are going to be put in place to protect pedestrians trying to get to the station?
e.     St Mary’s Road is a dead end with Victorian terraces either side so how is the construction traffic going to turn around and what plans will be in place to ensure one way traffic to allow the lorries in and out of Stainforth Road?





2.     Design
According to LBWF Urban Design Supplementary Planning Document paragraph 5.7.3 states:

In some places within the borough, such as some Victorian or Edwardian terraced streets, the character is very distinct with strong building ‘rhythms’ and a prevalence of unifying features, materials and detailing. New development should therefore take these into account in the design response, by seeking to reflect the prevailing scale, proportion and detailing of buildings, albeit not necessarily by way of a pastiche response to context.

How can an 11 storey modern glass and brick tower block come any way to meeting this requirement? Another tower block so close to Hoe Street is going to change the whole nature of the area and overwhelm the existing 2 storey Victorian Terraces in St. Mary’s Road. This is the road that leads to the historic Walthamstow Village visited by hundreds of tourists! This cannot be allowed to happen and is contrary to council policies.

3.     Fire Precautions
a.     Grenfell - After the Grenfell disaster it is vital a proper analysis is made of how the emergency services will access this very restricted site. Until the Grenfell Inquiry is completed we don’t believe any tower blocks should be built until it is fully understood why the regulations allowed the Grenfell disaster. A fire at this very congested point would have a massive impact on the whole Town Centre and the risk is too great so this development should not be approved.
b.     Fire Safety - It is up to the planners to make sure the design of this building meets the necessary fire precautions such as a fire lift and sprinkler systems etc. Plans need to be in place to show how evacuation of the building can be achieved and how the emergency vehicles can access it and get the necessary water supplies to fight a fire.,

4.     Transport
a.     Victoria Line Congestion - Between Tottenham Hale Station and Walthamstow Central there are over 5,000 apartments being constructed or in the planning process. The Victoria Line is already at capacity with trains every minute. This hotel with no car access is going to create a lot of tube journeys and will just help to congest the line even further. There is no more capacity in central Walthamstow for buildings that create additional tube journeys. People moved to Walthamstow because it was cheap and it was easy to get into central London. Now the tube is getting dangerously overcrowded before many of the new properties are completed and TfL have no plans for increasing the capacity of the line. The council must stand up to the GLA and demand a stop to these developments as the transport infrastructure cannot cope with the forth coming demand.
b.     Road Network - Hoe Street is often jammed with traffic as it is a major route through the Borough. This development cannot be accessed from Hoe Street without blocking the road and the buses. The only access to it is through quiet residential streets which have been made quieter by Mini Holland. This scheme cannot be built without destroying the environment of the local residents and having a significant impact on the people living on the route of the construction vehicles from the North Circular up Chingford Road into Hoe Street. Thousands of residents along the route will have their lives disrupted by all the construction traffic trying to head to the Town Centre for the various developments that are being proposed. As noted earlier this is going to go on for over 10 years.



5.     Servicing the Site
a.     Construction Traffic - Very severe restrictions will need to be put on the construction traffic to ensure the Town Centre does not jam up and the lives of the residents in the surrounding roads is not made a misery. All construction staff will have to arrive at the site on public transport which will just congest the buses and tube more. The Planning Committee will need to see a fully worked up transport plan to show how the construction traffic will be managed and which streets disrupted.
b.     Hotel Traffic - many people arrive at a hotel by taxi as they have luggage to be carried and it is not clear what route the taxis will take and how many extra vehicle journeys this will take. They cannot be allowed to drop off in Hoe Street as that will just add to the existing congestion.

6.     Overshadowing
The Daylight and Sunlight Study show that over shadowing is an issue but is played down with words like “The results confirm that the proposed development does not fully comply with the BRE numerical recommendation.” Why should some residents lose their light just so that Strettons can fund a new office? This is wrong and further proves a tower block in this location is not acceptable.

We urge you to reject this plan as it is out of keeping with the existing low rise Victorian terraces, is too congested a site and access is only through existing quiet residential streets. This is a bad scheme for the Town Centre and for the adjacent residents.


Yours sincerely,

Adrian Stannard
Planning Watch





Friday, 26 October 2018

New Schools in Lea Bridge Road


Thames Water 150a Lea Bridge Road Leyton London E5 9RJ

Redevelopment of the site for the construction of a new two-storey primary school building including a nursery, and the construction of a new three-storey secondary school building, together with associated external play areas, sports grounds, ball courts, multi-use games areas, vehicle access, parking, pick-up and drop-off areas, cycle parking, and landscaping (Departure from the Waltham Forest Local Plan). An application is also made for the provision of temporary school accommodation in the form of one- and two-storey temporary school buildings.



150A Bridge Road, E5 9RJ

My objections to this planning application are :

1. Metropolitan Open Land - there is no point in having these designations if they are to be ignored as soon as someone comes along wanting to develop the land. 

2. Site Location: - Lea Bridge Road has been congested by traffic for decades so it is not sensible to develop the area with residential and schools. This land is the flood plain of the river Lea and as such should be kept as open land and passed to the Lee Valley Park Authority to incorporate into the park.

3. Aquifers - Thames Water maintain water storage aquifers under the site and these should be given priority over any other development. The land above should be kept clear and used for ecological purposes and wild life as a barrier to the the urban environment which further up Lea Bridge Road is heavily congested. This needs to be the green lung for the over developed surrounding area.

4. Transportation - access to the school will be via a variety of means and all of which involve using the heavily congested Lea Bridge Road. It will just cause stress to the pupils and teachers attempting to reach the school on time each day. It will also be essential there is a staggered exit from the school at the end of the day as the transport routes will not be able to cope with 1,800 pupils all leaving at the same time. All this will have an effect on the mental well being of the staff and pupils.

5. Bus Route - TfL cannot afford to run the 48 bus route so are proposing to close the bus route which many pupils and staff would use to get to and from Walthamstow Central. The closure of this route will congest the other routes making it a misery to travel by bus to and from the proposed school.

This is completely the wrong site for a school which will attract thousands of transport movements each day and should be refused.

Adrian

Monday, 1 October 2018

Town Centre not an Asset of Community Value

The Council has decided not to register Walthamstow Town Centre as an Asset of Community Value - no surprise there as they want to fell 81 mature trees and allow the open space to be reduced by 32% to enable Capital and Regional and Mount Anvil to destroy the Town Centre by 7 years of building works and the construction of 29 storey tower blocks just to balance the Council's budget.



Dear Sir,
ASSETS OF COMMUNITY VALUE (ENGLAND) REGULATIONS 2012
Town Square, Selborne Walk, Walthamstow, London E17

I am writing to confirm the outcome of the Council’s decision regarding the above. This follows the nomination application which was received on 29/07/2018.

Having considered the nomination submitted by The Waltham Forest Civic Society as nominee, the Council has categorised this nomination as unsuccessful. The reasons for the Council’s decision were:
The proposals in relation to the Town Square involve the extensive re-landscaping of the Town Square space in order to improve the function of the space relative to the Mall to which it leads. The existing Square measures approximately 13 940 sqm in area. In line with the approved planning permission under file reference 171355, 4,437 sq.m of the Square will be built over as a result of the extension of the Mall. This equates to approximately 32% of the land within the Town Square which will no longer be in use as open space and there is therefore no realistic chance of the current use continuing in relation to that part of the land.

Accordingly the Council has concluded that it cannot be considered realistic to think that the whole of the land subject to the above nomination can continue to be used in a way that will further the social wellbeing or social interest of the local community.

Consequently the Council will now add this nomination to the List of Unsuccessful Community Nominations for a period of five years. This list is
available to view on the Council’s website by searching under Assets of
Community Value.
Yours sincerely,
Jane Custance
Director of Strategic Planning and Development

Saturday, 22 September 2018

Chatbots

Dear community champions,

Thank you for all of the work you do to help keep our neighbourhoods clean, green and safeJ

We know that clean streets are one of the most important things to our residents. Earlier this year we launched an innovative new technology which allows you to report issues such as fly-tipping and dog fouling on the go straight from your mobile phone.

If you’re on Social Media, you can quickly report issues 24/7 by visiting the Waltham Forest Council Facebook webpage www.facebook.com/walthamforestcouncil page and pressing ‘Send Message’ at the top of the page. This will open a Messenger conversation with a Chatbot, which guides users through the process of submitting a report.

Twitter users can report issues by sending a Direct Message to @WFTellWalt

Once a report has been submitted, you receive a unique reference that can be used to track online. You also have the option to receive updates via Messenger.

The new tool means that your reports will go straight through to the council crews on the ground speeding up response times and ensuring our streets are even cleaner.


Please help us by reporting neighbourhood issues to us and by telling you friends and neighbours about the new reporting Chatbots!


Wajid Ali
Senior Campaigns Officer
Waltham Forest Council
Room 224
Waltham Forest Town Hall
Forest Road
London E17 4JF

Tel: 020 8496 8492


BoC Signature

North London Waste Plan - update

North London Waste

The Enchanted Garden

The Enchanted Garden